*UPDATED* WoW Shadowlands 9.1 Replace: Is It Behind Schedule?

0
189


The WoW Shadowlands 9.1 replace, or Chains of Domination, has been revealed – and it has tons in retailer!

This large patch features a new raid, new dungeon, flying in Shadowlands, and many extra.

This is what we find out about Shadowlands 9.1, the subsequent huge World of Warcraft replace.

Newest – Is Shadowlands 9.1 Behind Schedule?

After revealing the huge WoW Shadowlands 9.1 replace at BlizzCon 2021, followers have been ready to leap into its new content material.

The replace was initially introduced on February 19th – however over a month later we nonetheless haven’t any new phrase on when Shadowlands 9.1 will really come.

Blizzard not too long ago got here again sturdy after a dry run of lackluster Shadowlands updates by dropping Shadowlands 9.0.5, however the huge patch can solely maintain gamers occupied for thus lengthy.

WoW Shadowlands 9.1 Replace

WoW Shadowlands 9.1, the Chains of Domination replace, goes to be completely large.

SLIPPED THROUGH: A bluepost has leaked the upcoming Shadowlands 9.1 replace

This is what Blizzard have leaked in regards to the upcoming replace simply forward of BlizzCon 2021:

“The traitorous Web site Denathrius has been defeated… however the energy of the Maw nonetheless grows. In Chains of Domination, the upcoming first main content material replace for World of Warcraft: Shadowlands, gamers will delve into new depths of the Jailer’s hopeless area, searching for to grasp the true nature of his malignant plans.
However the Banished One has a horrible new champion in his service – a merciless instrument of despair conscripted by Sylvanas Windrunner, able to putting in dread into the hearts of Azeroth’s heroes like no creature of the Shadowlands.

Uncover the Mysteries of Korthia – The Jailer is looking for the important thing to satisfy his twisted designs – and he has pulled a fraction of a long-lost area into the Maw itself to search out it. Search solutions in historic Korthia, the Metropolis of Secrets and techniques, and have interaction in new quests and out of doors actions.

The Covenants Strike Again – With the energy of the kyrian, evening fae, necrolords, and venthyr restored, embark on a brand new marketing campaign to unite the 4 covenants – and collectively, launch an assault in opposition to the Jailer in his residence territory.

Raid the Sanctum of Domination – Courageous treacherous, unexplored reaches of Torghast in a brand new 10-boss raid: the Sanctum of Domination. Encounter the true Eye of the Jailer, flip the tide in opposition to the Tarragrue, and are available face-to-face with the Banshee Queen herself in a fateful confrontation.

New Mega-dungeon – Tazavesh, the Veiled Market – Collect your celebration and uncover unique wares and unusual creature in an eight-boss Mythic mega-dungeon set in a bazaar of the mysterious Brokers, and culminating in a high-stakes heist to steal highly effective artifacts from Azeroth.

And Extra – Gear up for Shadowlands Raid, Dungeon, and PvP Season 2, with a seasonal Mythic Keystone dungeon affix themed across the Jailer’s energy; don new Covenant cosmetics armor units that any class can put on; develop the powers of your Soulbinds and Conduits; add new mounts and pets to your menagerie; Unlock flying within the Convenants’ 4 domains; and way more.”

Patch Notes

Whereas we do not have an official set of patch notes, these new Chains of Domination leaks give us very excessive hopes for a large Shadowlands 9.1 replace.

WoW Shadowlands Update 9.1 Chains of Domination Patch Notes
A NEW WORLD: Shadowlands is including a ton in 9.1, Chains of Domination

We count on these modifications will all be made on the identical time, somewhat than spaced out between Shadowlands updates.

Meaning WoW Shadowlands 9.1 ought to embody the next:

  • Sanctum of Domination, a 10-boss raid (Sylvanas, Kel’Thuzad, Eye of Jailer)
  • Flying in Shadowlands
  • Important story quests
  • Tazavesh, the Veiled Market, an 8-boss megadungeon
  • Shadowlands PVP Season 2
  • New Mythic Keystone Affix
  • New Korthia, the Metropolis of Secrets and techniques zone

READ MORE: WoW Shadowlands Sanctum of Domination Raid LEAKED

Shadowlands 9.0.5 Arrives

Whereas followers are trying ahead to the huge modifications from Shadowlands 9.1 as revealed at BlizzCon 2021 – the primary huge patch earlier than then can be Shadowlands 9.0.5.

This replace brings large class steadiness modifications, the return of Valor Factors, and many extra.

It goes dwell in-game on March ninth at roughly 11am EST when servers return from the weekly reset.

Shadowlands Q&A at BlizzCon 2021

After the large BlizzCon 2021 Day 1 reveals, we have Day 2 to study a lot extra about them.

Within the meantime, meet up with the brand new WoW Shadowlands Chains of Domination replace with Blizzard’s breakdown under:

Chains of Domination Formally Revealed at BlizzConline

BlizzCon 2021 has put any doubts to relaxation in regards to the Chains of Domination leaks (which got here instantly from Blizzard itself!)

WoW Shadowlands Trailer Update 9.1 Chains of Domination
BIGGER THINGS: The Shadowlands story is evolving in 9.1

The occasion has revealed Chains of Domination, the Shadowlands 9.1 Replace.

You’ll be able to watch its new trailer under:

LEAVE A REPLY

Please enter your comment!
Please enter your name here